Case studies  of geotechnical activities – from our high quality, cost effective and pragmatic geotechnical, mining, geological and environmental services

Basement Impact Assessment Hackney London

Basement Impact Assessment Hackney London New Development

Earth Environmental & Geotechnical (Southern) Ltd were commissioned to undertake a Basement Impact Assessment for a new development in Hackney, London. As part of the assessment Earth Environmental & Geotechnical (Southern) Ltd carried out: Desk Study, Ground Investigation, Laboratory Geotechnical/Environmental Testing
Basement Impact Assessment & Surface Water Drainage Design 2

Basement Impact Assessment London

Earth Environmental & Geotechnical's Reading office was commissioned to undertake a Basement Impact Assessment (BIA) and surface water management drainage design (SUDs Report) at a private residential development in West London.EEGSL were contacted after a previous consultant was unable to complete the works to the client's specification. undertook ground investigation works including a 10m cable percussive borehole, a series of gas and groundwater monitoring visits and soakaway testing (BRE 365 Standard).
Chippenham Lane, Slough, Subsidence Ground Investigation and Assessment 

Ground Investigation and Assessment of Subsidence in Slough

Chippenham Lane, Slough, Subsidence Ground Investigation and Assessment  Earth Environmental & Geotechnical's Reading Office were commissioned to undertake a ground investigation for two semi-detached dwellings along Chippenham Lane in Slough. The investigation was requested to help understand settlement issues impacting both properties.
site investigation found a hydrocarbon impacted benzene plume

In-Situ Remediation Soil & Groundwater Treatment

Earth Environmental & Geotechnical have been involved in the assessment of ground conditions on the site for a number of years. The site is a shopping park which is being redeveloped and rejuvenated.
Site Investigation and Remediation Bridge Prescot 20141113_123527

Site Investigation and Remediation Strategy- Retail Park, Prescot

The land was being acquired from the local council and pre-acquisition desk studies highlighted adverse ground conditions associated with shallow coal mining and former land uses.
New Retail Park, Prescot

New Retail Park, Prescot

New retail park in Prescot. A series of site investigations have been conducted on a former BICC cable site that was previously remediated in 2005 by the local council.
Travis Brow Stockport

Travis Brow Stockport

Stockport MBC were undertaking a feasibility study for a new link road between the M60 and the A6 in Stockport. It was intended for the proposed new road to cut into sloping ground below one of the arches of the Stockport Viaduct.
Preliminary ecological appraisal

Snig Hall Lach Dennis

A residential developer requested a Preliminary Ecological Appraisal to be undertaken as part of a planning application submission to Cheshire West and Chester Council (CWaC).
Preliminary roost assessment

Dobb Hedge Close Case History

A residential developer requested a Preliminary Roost Assessment to be undertaken as part of a planning application submission to Trafford Council. The site was a detached 2-storey house built in the 1980s.
Coal Mining Risk Assessment

Coal Mining Risk Assessment Edinburgh

A residential developer requested a Coal Mining Risk Assessment to be undertaken as part of a planning application submission, as the land fell within a Coal Authority Development High Risk Area,
coal mining

Coal Mining Risk Assessment Bristol Jan 2018

,
A residential developer requested a Coal Mining Risk Assessment to be undertaken as part of a planning application submission, as the land fell within a Coal Authority Development High Risk Area
Coffer dam in Poole

Ground Conditions Survey Poole Jan 2018

Poole Borough Council requested a ground conditions survey at the base of an existing coffer dam in Poole, Dorset, in preparation for piling activities.
Cinderford case study site investigation

Geo-Environmental Investigation Cinderford

, ,
A Developer requested a combined Phase I and Phase II Investigation for a proposed residential development on a existing river bank in Cinderford, Gloucestershire.
Crystal house case history

Crystal House Case History

A residential developer requested a Preliminary Roost Assessment (bat scoping survey) to be undertaken as part of a planning application submission to Daventry and District Council (DDC).
Crystal house case history

Case Study Template

A residential developer requested a Preliminary Roost Assessment (bat scoping survey) to be undertaken as part of a planning application submission to Daventry and District Council (DDC).